From: route@monster.com
Sent: Monday, October 26, 2015 10:56 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: drive tseter
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Janard Lakes Email: tiyako1975@yahoo.com Cell 404-516-7326 SUMMARY OF QUALIFICATIONS
Skilled
in Radio Base Stations, Cabling, Connection to Rectifier, Installation of
T-1, Alarms, Termination of Receive and Transmit Coax Cable, Mounting
and Bracing, Termination of Power, Data, and Radio Frequency Cables, Able to
Read, Identify, and change Site Configurations according to Floor Plans CERIFIED
IN: TMOBILE MODERNIZATION, SPRINT
NETWORK VISION, 6000 ERICSSON CABINETS August
2014- December 2014: L1900 TMO Project in North and South Carolina, Rip and
replace old cabinet with new cabinet, Install all radios, GPS Install, DUG
install and Commissioning, DUL Commissioning, Battery Install, Hardware
install, Pictures, Call Testing, Closeout Packages. June
2014-August 2014: Sprint Network Vision, Installation, Integration and
call testing, troubleshooting, SP 210’s, DBA programming, Sector swapping,
Screen captures and reports. November
2013- February 2014: Verizon, Installation of the AWS Mini-rack,
Install of GPS, Fibers, SFP’s, Power, SPA Card, Commissioning of AWS,
Downloading of Scripts, Screen Captures and reports. April
2013-August 2013: Alcatel Lucent, Installation of the 7210 Router, Upgrade,
Scripts, Power, Decommissioning of old equipment, Labeling, Activity reports. December
2012-March 2013 Sprint Vision, SP210, Integration of the 4G LTE, 3G SIU
Prep, Backhaul Support with CIENA, Alarm Clearing, DBA Commissioning, Call
Testing. July 2012-November 2012:
T-Mobile Modernization, 2C, 2B, 1A Power Upgrade, Integration of DUW, DUG,
Alarm Clearing, Call Testing. February 2012-June 2012:
US CELLULAR: LTE, Integration 6601 cabinet, eNodeB, 7705 Cisco Router, Gps
mounting, Power termination, Jumpers, Call testing, Alarm Clearing. September
2011-February 2012: AT&T-LTE:
NEA alarm testing, generating and clearing, troubleshooting, screen captures
and
closeout.
August
2010- September 2011: LTE/
B3,HS1- Installation of 6601, 6602 , eNodeB cabinet, Power up of
equipment, troubleshooting, integration, and closeout packages, Gps mounting,
call testing. June
2009 – July2010:
·
AT&T / Ericsson, 3106, 3206, 3518, 3418 ·
Integration/ Installation of Node B- UMTS /LTE 3000 /6000
series. ·
Used T-byrd to test T1’s and interfaced with the switch. ·
UMTS 1ST, 2nd, 3RD,4TH
carrier/Call test ·
Integration, Installation Trouble shoot AT&T/T-Mobile/Ericsson August
2007-June 2008: ·
Troubleshot Ericsson /AT&T and cleared trouble
tickets. ·
Cleared alarms on LMU’s and re-installed LMU’s to the
existing network. ·
Used Anritsu test gear to sweep antenna lines. ·
Used T-byrd to test T1’s and interfaced with the switch. EXI
PARSON / Cingular Wireless /Pac Bell/AT&T Aug
2005 – Nov 2006
Nokia Technician ·
Installation of Nokia Ultrasite GSM and LMU. Performed
upgrades to the existing BTS. ·
Test and turned up T1 circuits of various test equipments
detailing procedures and quality of signals ·
Created relaxed atmosphere and a great team environment in
tedious work
enviroment
Drive Tester
·
Polaris Wireless MI E-911 Calibration Drive Testing Project.
·
Used the following equipment: Timmons, Scanners, GPS
System Data Processing. ·
Installed E-Pron for CCU (Climate Control Unit) and ASU’s
(Antennae Sharing Unit) ·
Installed cellular and electronic equipment adherent to
customer specification.
RT-1 ·
Channel Adds (Installation of additional radios) ·
Create/Install 2nd T-1
connections and tested equipment in the field ·
Tested equipment from the field in the warehouse (2106
& 2206) for PCN EDGE upgrades
·
Installation of ASU’s (Antennae
Sharing Units) ·
Trained employees on installation
and equipment testing procedures and installation of cabinets ·
Performed integration, call
testing, and trouble-shooting of FM, AM, UHF, and cellular equipment
Termination of Power, Data, DSX, CSU, DSU, RJ-45’s, and Radio Frequency
Cables ·
Channel Adds (Installation of additional radios) ·
Create/Install 2nd T-1 connections
and tested equipment in the field ·
Tested equipment from the field in the warehouse (2106
& 2206) for PCN EDGE upgrades Reference
Upon Request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|